Skip to content

Latest commit

 

History

History
18 lines (14 loc) · 928 Bytes

checklist_pre-pre-build.md

File metadata and controls

18 lines (14 loc) · 928 Bytes

Pre-pre build

Objectives of living on land, prior to building:

  1. get to know the seasons, weather patterns, azimuths, ecosystems, flora, fauna and neighbors/community.
  2. start applying for all your permits from the local council (see list below).
  3. start improving/building your infrastructure: gravel roads, fences, bridges, etc.
  4. start recruiting tradies and/or volonteer builders (see Earthship Whitecard training)

The below page is intended to provide guidance to owner-builders on how to live on site throughout the build (minimum of 9 months with tradies, average ownwer-builder without trades 2-5 years).

  • buy land (insured as owner-builder)
  • Setup shelter (camping, campervan, shed, container small home, etc)
  • Water management
  • Heating (hot water, fire cooking, etc)
  • Sewage (bucket system, composting toilet, outhouse trench holes, small septic, etc)
  • Network
  • Safety