You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
This was an ad hoc value purely for visualization purposes- feel free to
change it, the proper value along with the units may be in the related pdf
or in the erosion paper with Michael Barton (Isaac spent some time figuring
it out for different conditions)
On Wed, Apr 13, 2016 at 3:42 AM, Vaclav Petras [email protected]
wrote:
Provide reasoning for the value 100 in Compute new DEM with erosion
carved-in in the Erosion modeling (hydrology_erosion.html) assignment.
Provide reasoning for the value 100 in Compute new DEM with erosion carved-in in the Erosion modeling (
hydrology_erosion.html
) assignment.Additionally, consider changing the value.
The text was updated successfully, but these errors were encountered: