parent nav_order title status date deciders consulted informed
Decisions
100
Design & a11y reviews
Proposed
2023-08-04
Design/A11y lead
All designers
All project technical staff

Accessibility testing methods

Context and Problem Statement

In order to work in an agile fashion and ensure code changes meet both design spec and our accessibility target, we should align on a consistent process to achieve this. As part of the accessibility review for each PR, the original developer will do a first pass of both design and a11y review. This DR covers how designers will be the second set of eyes on those user-facing changes.

Considered Options

  • Review each PR locally before merging
  • Review all merged PRs for the current sprint in the deployment environment at the end of the sprint
  • Review entire application in the deployment environment every other sprint
  • Review entire application in the deployment environment when designers are available

Decision Outcome

Chosen option: "Review all merged PRs for the current sprint in the deployment environment at the end of the sprint", because it is the best we can reasonably do given our comfort with the tools and time available.

Consequences

  • Good, because it maximizes coverage
  • Good, because it does a decent job of preventing issues from sneaking by for more than a sprint
  • Bad, because it requires extra time to create a new issue for each problem discovered
  • Bad, because it requires extra time to filter Github PRs by date

Confirmation

This decision is confirmed by all designers, as they will be doing this work.

Pros and Cons of the Options

Review each PR locally before merging

  • Good, because it maximizes coverage of changes
  • Good, because it prevents almost all issues from sneaking by
  • Good, because feedback can go directly into the PR
  • Bad, because it requires frequent intervention by designers who may not be comfortable with necessary tools

Review all merged PRs for the current sprint in the deployment environment at the end of the sprint

  • Good, because it maximizes coverage of changes
  • Good, because it does a decent job of preventing issues from sneaking by for more than a sprint
  • Bad, because it requires extra time to create a new issue for each problem discovered
  • Bad, because it requires extra time to filter Github PRs by date

Review entire application in the deployment environment every other sprint

  • Good, because it maximizes coverage of the final user experience (end to end)
  • Neutral, because it does a decent job of preventing issues from sneaking by for more than two sprints, but can mean more work is needed to recover from it
  • Bad, because it requires extra time and cognitive load to check what was merged and identifying in the environment what to review. It's more likely in two vs one sprint that multiple PRs covered a certain page/feature, so filtering PRs by date is less useful.
  • Bad, because it requires extra time to create a new issue for each problem discovered

Review entire application in the deployment environment when designers are available

  • Neutral, because it could maximize coverage of the final user experience (end to end), but only as much as the designer has time for
  • Bad, because lingering design/a11y debt can be harder to pay off the longer it lingers
  • Bad, because it requires extra time and cognitive load to check what was merged and identifying in the environment what to review. It's higly likely that multiple PRs covered a certain page/feature, so filtering PRs by date is useless.
  • Bad, because it requires extra time to create a new issue for each problem discovered