Skip to content

update pipeline code and steps nexB#1283 #10

update pipeline code and steps nexB#1283

update pipeline code and steps nexB#1283 #10

Triggered via push September 22, 2024 02:28
Status Failure
Total duration 1m 36s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build (3.10)
Process completed with exit code 2.
build (3.11)
Process completed with exit code 2.
build (3.12)
The job was canceled because "_3_10" failed.
build (3.12)
The operation was canceled.