Skip to content

fix: setup

fix: setup #425

Triggered via push October 25, 2024 14:42
Status Failure
Total duration 1m 38s
Artifacts

test.yaml

on: push
Matrix: functional
Fit to window
Zoom out
Zoom in

Annotations

5 errors
functional (macos-latest, 3.12)
Process completed with exit code 1.
functional (macos-latest, 3.9)
The job was canceled because "macos-latest_3_12" failed.
functional (macos-latest, 3.11)
The job was canceled because "macos-latest_3_12" failed.
functional (ubuntu-latest, 3.12)
The job was canceled because "macos-latest_3_12" failed.
functional (ubuntu-latest, 3.12)
The operation was canceled.