Skip to content

result for sc4

result for sc4 #209

Triggered via push December 9, 2024 06:19
Status Failure
Total duration 10m 47s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
build (3.11)
Process completed with exit code 30.
build (3.8)
The job was canceled because "_3_11" failed.
build (3.8)
The operation was canceled.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.
build (3.9)
The job was canceled because "_3_11" failed.
build (3.9)
The operation was canceled.
build (3.11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636