Skip to content

Run test on fyne development branch every day #270

Run test on fyne development branch every day

Run test on fyne development branch every day #270

Triggered via schedule August 29, 2024 04:12
Status Failure
Total duration 4m 41s
Artifacts

fyne-qa-head.yml

on: schedule
Matrix: qa-develop / qa
Matrix: qa-master / qa
Matrix: qa-v24 / qa
Fit to window
Zoom out
Zoom in

Annotations

16 errors
qa-master / qa (macos-latest)
reading golang.org/x/sync/go.mod at revision v0.7.0: git ls-remote -q origin in /Users/runner/go/pkg/mod/cache/vcs/d7307bee4c4ea6392fc96a77e51c2a492fb1cac611e6d73d5197c5d523473656: exit status 128:
qa-master / qa (macos-latest)
Process completed with exit code 1.
qa-master / qa (windows-latest)
The job was canceled because "macos-latest" failed.
qa-master / qa (windows-latest)
The operation was canceled.
qa-master / qa (ubuntu-latest)
The job was canceled because "macos-latest" failed.
qa-master / qa (ubuntu-latest)
The operation was canceled.
qa-develop / qa (ubuntu-latest)
Process completed with exit code 1.
qa-develop / qa (windows-latest)
The job was canceled because "ubuntu-latest" failed.
qa-develop / qa (windows-latest)
The operation was canceled.
qa-v24 / qa (ubuntu-latest)
Process completed with exit code 1.
qa-v24 / qa (windows-latest)
The job was canceled because "ubuntu-latest" failed.
qa-v24 / qa (windows-latest)
The operation was canceled.
qa-develop / qa (macos-latest)
The job was canceled because "ubuntu-latest" failed.
qa-develop / qa (macos-latest)
The operation was canceled.
qa-v24 / qa (macos-latest)
The job was canceled because "ubuntu-latest" failed.
qa-v24 / qa (macos-latest)
The operation was canceled.