Skip to content

Timeline

Timeline #284

Triggered via pull request September 3, 2024 12:29
Status Failure
Total duration 3m 39s
Artifacts 1

build.yml

on: pull_request
Matrix: Lint
Matrix: Test
Build integration test binaries
2m 1s
Build integration test binaries
Matrix: integration-tests
Matrix: Build
Publish pre-release
0s
Publish pre-release
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 2 warnings
Lint (stable): reporter/datadog_reporter.go#L367
hugeParam: traceKey is heavy (104 bytes); consider passing it by pointer (gocritic)
Lint (stable): reporter/datadog_reporter.go#L489
var-declaration: should drop = nil from declaration of var timestamps; it is the zero value (revive)
Lint (stable): reporter/datadog_reporter.go#L527
unnecessary leading newline (whitespace)
Lint (stable)
Process completed with exit code 2.
Test (stable, ubuntu-24.04)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Lint (stable)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2

Artifacts

Produced during runtime
Name Size
integration-test-binaries
41.6 MB