Skip to content

fix composite adjust #24

fix composite adjust

fix composite adjust #24

Triggered via push December 8, 2023 20:10
Status Failure
Total duration 1m 45s
Artifacts

macos.yml

on: push
Matrix: macos
Fit to window
Zoom out
Zoom in

Annotations

5 errors
macos (macos-13, -DOQS_ALGS_ENABLED=STD)
Process completed with exit code 2.
macos (macos-11, -DOQS_ALGS_ENABLED=STD)
The job was canceled because "macos-13_-DOQS_ALGS_ENABL" failed.
macos (macos-11, -DOQS_ALGS_ENABLED=STD)
Process completed with exit code 2.
macos (macos-12, -DOQS_ALGS_ENABLED=STD)
The job was canceled because "macos-13_-DOQS_ALGS_ENABL" failed.
macos (macos-12, -DOQS_ALGS_ENABLED=STD)
The operation was canceled.