Skip to content

test ko

test ko #2

Triggered via pull request November 16, 2024 21:03
Status Cancelled
Total duration 1m 55s
Artifacts

continuous-integration.yml

on: pull_request
Matrix: lint
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

16 errors
lint (3.11)
Process completed with exit code 1.
lint (3.12)
The job was canceled because "_3_11" failed.
lint (3.12)
The operation was canceled.
lint (3.10)
The job was canceled because "_3_11" failed.
lint (3.10)
The operation was canceled.
lint (3.13)
The job was canceled because "_3_11" failed.
lint (3.13)
The operation was canceled.
test (3.12, windows-latest)
Process completed with exit code 1.
test (3.10, windows-latest)
The job was canceled because "_3_12_windows-latest" failed.
test (3.10, windows-latest)
The operation was canceled.
test (3.13, windows-latest)
The job was canceled because "_3_12_windows-latest" failed.
test (3.13, windows-latest)
The operation was canceled.
test (3.11, windows-latest)
The job was canceled because "_3_12_windows-latest" failed.
test (3.11, windows-latest)
The operation was canceled.
coverage
Canceling since a higher priority waiting request for 'refs/pull/1/merge' exists
coverage
The operation was canceled.