Skip to content

Bump ch.qos.logback:logback-classic from 1.3.11 to 1.3.12 #99

Bump ch.qos.logback:logback-classic from 1.3.11 to 1.3.12

Bump ch.qos.logback:logback-classic from 1.3.11 to 1.3.12 #99

Triggered via push November 29, 2023 22:47
Status Failure
Total duration 53s
Artifacts

ci.yml

on: push
Matrix: tests-and-analysis
Matrix: platform-integration
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Tests and Analysis (JDK: 8)
Process completed with exit code 1.
Tests and Analysis (JDK: 11)
The job was canceled because "_8" failed.
Tests and Analysis (JDK: 11)
The operation was canceled.
Tests and Analysis (JDK: 21)
The job was canceled because "_8" failed.
Tests and Analysis (JDK: 21)
The operation was canceled.
Tests and Analysis (JDK: 17)
The job was canceled because "_8" failed.
Tests and Analysis (JDK: 17)
The operation was canceled.