Skip to content

Commit

Permalink
Re-run test script with latest ssc
Browse files Browse the repository at this point in the history
  • Loading branch information
brtietz committed Dec 9, 2024
1 parent c20b8c6 commit 3abdcaa
Showing 1 changed file with 8 additions and 8 deletions.
16 changes: 8 additions & 8 deletions test_results_win64.csv
Original file line number Diff line number Diff line change
Expand Up @@ -165,12 +165,12 @@ Custom Generation Profile,All Equity Partnership Flip,756864000,18.1665,25.9936,
Custom Generation Profile,Sale Leaseback,756864000,17.8213,25.9936,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: IRR in target year is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: NPV is $-5.31498e+07. A negative NPV indicates project costs are higher than revenues.
Custom Generation Profile,LCOE Calculator,756864000,NA,NA,;
Custom Generation Profile,None,756864000,NA,NA,;
PVWatts Wind Battery Hybrid,Single Owner,570748160,9.18837,6.22664,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind Battery Hybrid,Host Developer,1.11888e+06,15.5182,16.5422,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind FuelCell Battery Hybrid,Single Owner,574494912,9.09451,5.41111,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind FuelCell Battery Hybrid,Host Developer,2.68751e+06,39.5279,40.224,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
Photovoltaic Wind Battery Hybrid,Single Owner,602560000,6.91055,5.95279,; Notice: Simulation time step is 60 minutes for pvsamv1. Notice: Simulation time step is 60 minutes for windpower.
Photovoltaic Wind Battery Hybrid,Host Developer,1.28811e+06,13.4328,16.5416,; Notice: Simulation time step is 60 minutes for pvsamv1. Notice: Simulation time step is 60 minutes for windpower.
CustomGeneration PVWatts Wind FuelCell Battery Hybrid,Single Owner,1331819776,11.5575,5.41352,; Notice: Simulation time step is 60 minutes for custom_generation. Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
CustomGeneration PVWatts Wind FuelCell Battery Hybrid,Host Developer,759754624,14.5663,14.6379,; Notice: Simulation time step is 60 minutes for custom_generation. Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind Battery Hybrid,Single Owner,570748160,9.06794,6.22664,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind Battery Hybrid,Host Developer,1.11888e+06,15.2998,16.5422,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind FuelCell Battery Hybrid,Single Owner,574494912,8.94603,5.41111,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind FuelCell Battery Hybrid,Host Developer,2.68751e+06,39.3389,40.0354,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
Photovoltaic Wind Battery Hybrid,Single Owner,602560000,6.80878,5.95279,; Notice: Simulation time step is 60 minutes for pvsamv1. Notice: Simulation time step is 60 minutes for windpower.
Photovoltaic Wind Battery Hybrid,Host Developer,1.28811e+06,13.2179,16.5416,; Notice: Simulation time step is 60 minutes for pvsamv1. Notice: Simulation time step is 60 minutes for windpower.
CustomGeneration PVWatts Wind FuelCell Battery Hybrid,Single Owner,1331819776,11.5065,5.41352,; Notice: Simulation time step is 60 minutes for custom_generation. Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
CustomGeneration PVWatts Wind FuelCell Battery Hybrid,Host Developer,759754624,14.566,14.6375,; Notice: Simulation time step is 60 minutes for custom_generation. Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
final_configuration_eof,none,NA,NA,NA,

0 comments on commit 3abdcaa

Please sign in to comment.