Skip to content

optimize string split #26

optimize string split

optimize string split #26

Triggered via push October 9, 2024 02:58
Status Failure
Total duration 18s
Artifacts

tests-ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (v0.12.0-rc1)
Process completed with exit code 1.
build (v0.7.0)
The job was canceled because "v0_12_0-rc1" failed.
build (v0.11.1)
The job was canceled because "v0_12_0-rc1" failed.
build (v0.11.1)
The operation was canceled.
build (v0.9.0)
The job was canceled because "v0_12_0-rc1" failed.
build (v0.11.0)
The job was canceled because "v0_12_0-rc1" failed.