Skip to content

Fix

Fix #2099

Triggered via push August 28, 2023 16:56
Status Failure
Total duration 2m 59s
Artifacts

ci.yml

on: push
Matrix: codespell
Matrix: Forge Testing
Fit to window
Zoom out
Zoom in

Annotations

13 errors
Forge Testing (min-solc-via-ir)
Process completed with exit code 1.
Forge Testing (min-solc)
The job was canceled because "min-solc-via-ir" failed.
Forge Testing (min-solc)
The operation was canceled.
Forge Testing (post-shanghai-via-ir)
The job was canceled because "min-solc-via-ir" failed.
Forge Testing (post-shanghai-via-ir)
The operation was canceled.
Forge Testing (via-ir)
The job was canceled because "min-solc-via-ir" failed.
Forge Testing (via-ir)
The operation was canceled.
Forge Testing (intense)
The job was canceled because "min-solc-via-ir" failed.
Forge Testing (intense)
The operation was canceled.
Forge Testing (solc-past-versions-0)
The job was canceled because "min-solc-via-ir" failed.
Forge Testing (solc-past-versions-0)
The operation was canceled.
Forge Testing (solc-past-versions-1)
The job was canceled because "min-solc-via-ir" failed.
Forge Testing (solc-past-versions-1)
The operation was canceled.