Skip to content

feat: initial charm

feat: initial charm #3

Triggered via pull request September 3, 2024 21:09
Status Failure
Total duration 3m 10s
Artifacts 1

integration_test.yaml

on: pull_request
integration-tests  /  Plan
5s
integration-tests / Plan
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
Waiting for pending jobs
integration-tests  /  Plan Image Scanning
0s
integration-tests / Plan Image Scanning
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Matrix: integration-tests / scan
Fit to window
Zoom out
Zoom in

Annotations

4 errors
integration-tests / Build rock (hello)
The process '/snap/rockcraft/current/bin/skopeo' failed with exit code 1
integration-tests / Build charm (maubot)
The job was canceled because "rock_hello_maubot_rock_ro" failed.
integration-tests / Build charm (maubot)
The operation was canceled.
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
2024-09-03T21-09-21-bc51__plan
336 Bytes