feat: initial charm #4
integration_test.yaml
on: pull_request
integration-tests
/
Plan
5s
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
Waiting for pending jobs
integration-tests
/
Required Integration Test Status Checks
0s
Matrix: integration-tests / scan
Annotations
4 errors
integration-tests / Build rock (hello)
The process '/snap/rockcraft/current/bin/skopeo' failed with exit code 1
|
integration-tests / Build charm (maubot)
The job was canceled because "rock_hello_maubot_rock_ro" failed.
|
integration-tests / Build charm (maubot)
The operation was canceled.
|
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2024-09-03T21-18-15-b352__plan
|
338 Bytes |
|