Problem: subscription refactoring not merged (#375) (#376) #724
test.yml
on: push
integration_tests
25m 55s
cleanup-runs
8s
test-unit-cover
4m 1s
test-importer
4m 35s
test-rpc
6m 53s
test-e2e
7m 22s
test-sim-nondeterminism
13m 59s
test-sim-random-genesis-fast
3m 54s
test-sim-import-export
17m 49s
test-sim-after-import
25m 14s
Matrix: upload-cache
Annotations
3 errors and 2 warnings
test-sim-after-import
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 25 minutes.
|
test-sim-after-import
The operation was canceled.
|
upload-cache (macos-latest)
Process completed with exit code 150.
|
integration_tests
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/checkout@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
|
upload-cache (macos-latest)
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/checkout@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
|