Skip to content

feat(CICD): handling E2E test results in order to measure coverage #1358

feat(CICD): handling E2E test results in order to measure coverage

feat(CICD): handling E2E test results in order to measure coverage #1358

Re-run triggered September 27, 2024 17:39
Status Failure
Total duration 1h 2m 13s
Artifacts 50

cicd_1-pr.yml

on: pull_request
Initialize  /  Initialize
3s
Initialize / Initialize
Initialize  /  Check Previous Build
4s
Initialize / Check Previous Build
Initialize  /  Check Changed Files
16s
Initialize / Check Changed Files
PR Build  /  Initial Artifact Build
16m 56s
PR Build / Initial Artifact Build
Matrix: PR Test / linux-e2e-tests
Matrix: PR Test / linux-integration-tests
Matrix: PR Test / linux-postman-tests
PR Test  /  JVM Unit Tests - JDK
10m 2s
PR Test / JVM Unit Tests - JDK
PR Test  /  CLI Tests
20m 26s
PR Test / CLI Tests
PR Test  /  Frontend Unit Tests
0s
PR Test / Frontend Unit Tests
PR SonarQube  /  SonarQube Scan
7m 23s
PR SonarQube / SonarQube Scan
Finalize  /  Prepare Report Data
4s
Finalize / Prepare Report Data
Finalize  /  Final Status
0s
Finalize / Final Status
PR Notifier  /  Resolve Message
0s
PR Notifier / Resolve Message
PR Notifier  /  ...  /  slack-channel-resolver
1s
PR Notifier / Resolve Slack Channel / slack-channel-resolver
Matrix: PR Notifier / pr-notifier
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
PR Test / E2E Tests JVM E2E Suite
Process completed with exit code 1.
Finalize / Final Status
Process completed with exit code 1.
PR Test / E2E Tests JVM E2E Suite
No files were found with the provided path: **/target/jacoco-report/*.exec **/target/*-reports/TEST-*.xml. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
build-reports-E2E JVM E2E Suite Expired
12.6 KB
build-reports-IT Tests MainSuite 2a Expired
12.6 KB
build-reports-test-IT Tests MainSuite 2a
2.97 MB
workflow-data
1.54 KB