You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Provide feedback on usability of system from a lecturer perspective, suggest new features for lecturer use
2 Masnawi bin Miskam
Administration
Administritative Officer
Provide feedback on usability of system from an administrator perspective, share the required information in students' profile stored by administration
3 Nurul Asyikin Binti Muhamad
Student in Faculty of Computing
3rd Year Student
Provide feedback on usability of system from a student perspective, suggest additional features benefits to students
4 Kevin EE
Student in Faculty of Computing
3rd Year Student
Provide feedback on usability of system from a student perspective
Tasks involved in developing SRC documentation:
No
Date
Member Name
Role
Task
Status
1
01/05/2023
All members
Start writing raw information for the proposal
Complete
2
02/05/2023
Nur Arini Fatihah Binti Mohd Sabir
UX/UI Designer
Contact the Academic Advisor, our first stakeholder
Complete
3
02/05/2023
Wan Nur Sofea Binti Mohd Hasbullah
Main Developer
Prepare interview questions
Complete
4
02/05/2023
All members
Conduct a meeting with the first stakeholder
Complete
5
03/05/2023
All members
Gather information and start writing detailed content for the proposal
Complete
6
03/05/2023
All members
Create a use case diagram using draw.io
Complete
7
07/05/2023
Maisarah Binti Rizal
QA/Test Engineer
Contact our second stakeholder, third-year student
Complete
8
07/05/2023
All members
Conduct a meeting with the second stakeholder, a third-year student
Complete
9
07/05/2023
Mulyani Binti Saripuddin
QA/Test Engineer
Contact our third stakeholder, another third-year student
Complete
10
08/05/2023
All members
Conduct a meeting with the third stakeholder, another third-year student
Complete
11
09/05/2023
Wan Nur Sofea Binti Mohd Hasbullah
Contact our fourth stakeholder, an administrative officer
Complete
12
15/05/2023
All members
Conduct a meeting with the fourth stakeholder, an administrative officer
Complete
13
16/05/2023
All members
Discuss the use case to be included in the system
Complete
14
20/05/2023
All members
Complete the Software Requirements Specification (SRS) documentation
Complete
15
10/06/2023
All members
Complete the Software Design Description (SDS) documentation
Complete
16
15/06/2023
All members
Complete the Software Testing Documentation (STD) documentation
Complete
17
20/06/2023
All members
Complete the Behance
Complete
Contribution 🛠️
Please create an Issue for any improvements, suggestions or errors in the content.
You can also contact me using Linkedin for any other queries or feedback.