HW REV 1.3 : added Cu requirement 2oz/ft^2, checked insolation and tr…
…ack width delta T = 45°C with I=15A with 2 oz/ft^2
- Loading branch information
Showing
7 changed files
with
0 additions
and
0 deletions.
There are no files selected for viewing
Binary file modified
BIN
-57 Bytes
(99%)
hardware/rev 1.3/BOM_FAB-O-MATIC_PCB REV1.3_2024-08-18.xlsx