chore(deps): update dependency ubuntu to v24 #1967
build.yml
on: pull_request
Matrix: build
build-status
0s
Annotations
5 errors
build (1.18)
golangci-lint exit with code 2
|
build (1.17)
The job was canceled because "_1_18" failed.
|
build (1.17)
Process completed with exit code 1.
|
build (1.16)
The job was canceled because "_1_18" failed.
|
build (1.16)
Process completed with exit code 1.
|