Skip to content

fix(buffer): Optimistically initialize stacks as ready #15409

fix(buffer): Optimistically initialize stacks as ready

fix(buffer): Optimistically initialize stacks as ready #15409

Triggered via pull request September 19, 2024 11:35
Status Cancelled
Total duration 18m 34s
Artifacts 1

ci.yml

on: pull_request
Setup build metadata
0s
Setup build metadata
Lint
3m 23s
Lint
Lint Rust Default Features
1m 15s
Lint Rust Default Features
Test All Features (ubuntu-latest)
2m 38s
Test All Features (ubuntu-latest)
Test Python
49s
Test Python
Integration Tests
11m 54s
Integration Tests
Matrix: test
Matrix: Build Relay Binary
Matrix: Build Docker Image
Sentry-Relay Integration Tests
9m 2s
Sentry-Relay Integration Tests
self-hosted-end-to-end
8m 59s
self-hosted-end-to-end
Matrix: Upload build artifacts to gocd
Matrix: Publish Relay to DockerHub
Matrix: Publish Relay to GCR
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Test (macos-latest)
Process completed with exit code 101.
Test All Features (ubuntu-latest)
Process completed with exit code 101.
Test (windows-latest)
Process completed with exit code 1.
self-hosted-end-to-end
Canceling since a higher priority waiting request for 'CI-fix/spans-optimistic-readiness' exists
Sentry-Relay Integration Tests
Canceling since a higher priority waiting request for 'CI-fix/spans-optimistic-readiness' exists
Sentry-Relay Integration Tests
The operation was canceled.

Artifacts

Produced during runtime
Name Size
relay@x86_64-unknown-linux-gnu Expired
150 MB