Skip to content
Triggered via push November 18, 2024 20:43
Status Failure
Total duration 1m 15s
Artifacts

go_test.yml

on: push
Matrix: lint and test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
lint and test (1.20): gorm_lock_test.go#L44
undefined: testcontainers (typecheck)
lint and test (1.20): gorm_lock_test.go#L104
undefined: testcontainers (typecheck)
lint and test (1.20): gorm_lock_test.go#L189
undefined: testcontainers (typecheck)
lint and test (1.20): gorm_lock_test.go#L227
undefined: testcontainers (typecheck)
lint and test (1.20): model_test.go#L39
undefined: testcontainers (typecheck)
lint and test (1.20)
issues found
lint and test (1.22)
The job was canceled because "_1_20" failed.
lint and test (1.22)
The operation was canceled.
lint and test (1.21)
The job was canceled because "_1_20" failed.
lint and test (1.21)
The operation was canceled.