Upgrade Prometheus to v2.55.1 #36127
test-build-deploy.yml
on: pull_request
prepare
11s
doc-validator
11s
test-docs
/
test-docs
32s
Matrix: test
Matrix: integration-alpine
Matrix: integration
deploy
0s
Annotations
16 errors
test (3, 4)
Process completed with exit code 1.
|
lint
Process completed with exit code 2.
|
test (2, 4)
Process completed with exit code 1.
|
test (1, 4)
Process completed with exit code 1.
|
integration (4, 6)
Canceling since a higher priority waiting request for '9879/merge-arve/upgrade-mimir-prometheus-2.55' exists
|
integration (4, 6)
The operation was canceled.
|
integration (2, 6)
Canceling since a higher priority waiting request for '9879/merge-arve/upgrade-mimir-prometheus-2.55' exists
|
integration (2, 6)
The operation was canceled.
|
integration (5, 6)
Canceling since a higher priority waiting request for '9879/merge-arve/upgrade-mimir-prometheus-2.55' exists
|
integration (5, 6)
The operation was canceled.
|
integration (1, 6)
Canceling since a higher priority waiting request for '9879/merge-arve/upgrade-mimir-prometheus-2.55' exists
|
integration (1, 6)
The operation was canceled.
|
integration (0, 6)
Canceling since a higher priority waiting request for '9879/merge-arve/upgrade-mimir-prometheus-2.55' exists
|
integration (0, 6)
The operation was canceled.
|
integration (3, 6)
Canceling since a higher priority waiting request for '9879/merge-arve/upgrade-mimir-prometheus-2.55' exists
|
integration (3, 6)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
Docker Images
|
282 MB |
|
Race-enabled Mimir
|
77 MB |
|