Skip to content

chore: updates CHANGELOG #18

chore: updates CHANGELOG

chore: updates CHANGELOG #18

Triggered via push October 15, 2024 15:31
Status Failure
Total duration 40s
Artifacts

go.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 1 warning
build (1.19): async_list.go#L34
undefined: errors.Join
build (1.19)
Process completed with exit code 1.
build (1.23.x)
The job was canceled because "_1_19" failed.
build (1.23.x)
The operation was canceled.
build (1.22.x)
The job was canceled because "_1_19" failed.
build (1.22.x)
The operation was canceled.
build (1.20)
The job was canceled because "_1_19" failed.
build (1.20)
The operation was canceled.
build (1.21.x)
The job was canceled because "_1_19" failed.
build (1.21.x)
The operation was canceled.
build (1.19)
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/setup-go@v4. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/