Skip to content

Merge branch 'main' into develop #3771

Merge branch 'main' into develop

Merge branch 'main' into develop #3771

Triggered via push September 17, 2024 15:33
Status Cancelled
Total duration 11m 54s
Artifacts

all-checks.yml

on: push
Matrix: e2e-tests
Matrix: lint
Matrix: pip-compile
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

19 errors
e2e-tests (ubuntu-latest, 3.9) / e2e-tests
Process completed with exit code 2.
e2e-tests (windows-latest, 3.10) / e2e-tests
FailFast: cancelling since parallel instance has failed
e2e-tests (windows-latest, 3.10) / e2e-tests
The operation was canceled.
e2e-tests (windows-latest, 3.8) / e2e-tests
FailFast: cancelling since parallel instance has failed
e2e-tests (windows-latest, 3.8) / e2e-tests
The operation was canceled.
e2e-tests (windows-latest, 3.9) / e2e-tests
FailFast: cancelling since parallel instance has failed
e2e-tests (windows-latest, 3.9) / e2e-tests
The operation was canceled.
e2e-tests (windows-latest, 3.12) / e2e-tests
FailFast: cancelling since parallel instance has failed
e2e-tests (windows-latest, 3.12) / e2e-tests
The operation was canceled.
e2e-tests (windows-latest, 3.11) / e2e-tests
FailFast: cancelling since parallel instance has failed
e2e-tests (windows-latest, 3.11) / e2e-tests
The operation was canceled.
e2e-tests (ubuntu-latest, 3.12) / e2e-tests
FailFast: cancelling since parallel instance has failed
e2e-tests (ubuntu-latest, 3.12) / e2e-tests
The operation was canceled.
e2e-tests (ubuntu-latest, 3.10) / e2e-tests
FailFast: cancelling since parallel instance has failed
e2e-tests (ubuntu-latest, 3.10) / e2e-tests
The operation was canceled.
e2e-tests (ubuntu-latest, 3.8) / e2e-tests
FailFast: cancelling since parallel instance has failed
e2e-tests (ubuntu-latest, 3.8) / e2e-tests
The operation was canceled.
e2e-tests (ubuntu-latest, 3.11) / e2e-tests
FailFast: cancelling since parallel instance has failed
e2e-tests (ubuntu-latest, 3.11) / e2e-tests
The operation was canceled.