Skip to content

WIP: switching to pyproject.toml #212

WIP: switching to pyproject.toml

WIP: switching to pyproject.toml #212

Triggered via pull request November 13, 2023 15:11
Status Failure
Total duration 1m 42s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (3.8)
Process completed with exit code 4.
test (3.9)
The job was canceled because "_3_8" failed.
test (3.9)
Process completed with exit code 4.
test (3.10)
The job was canceled because "_3_8" failed.
test (3.10)
The operation was canceled.