Skip to content

Merge main into mlir-tcp #108

Merge main into mlir-tcp

Merge main into mlir-tcp #108

Re-run triggered September 15, 2023 05:41
Status Failure
Total duration 6h 0m 23s
Artifacts

buildAndTestTcp.yml

on: pull_request
Matrix: build-test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build-test (ubuntu-x86_64, in-tree, ON, stable)
The job running on runner torch-mlir-1 has exceeded the maximum execution time of 360 minutes.
build-test (ubuntu-x86_64, in-tree, ON, stable)
The operation was canceled.
build-test (ubuntu-x86_64, in-tree, ON, nightly)
The job running on runner torch-mlir-2 has exceeded the maximum execution time of 360 minutes.
build-test (ubuntu-x86_64, in-tree, ON, nightly)
The operation was canceled.