Excel spreadsheets for Evidence Based Scheduling as described by Joel Spolsky.
http://www.joelonsoftware.com/items/2007/10/26.html
- Read the article (see link above) several times
- Download schedule.xlsm from this repo
- Look over each tab in the spreadsheet - DO NOT change anything!
- Click the Monte Carlo button a few times (just for fun)
- Look at the VBA inside the spreadsheet - if you don't know how, please google "Excel VBA editor"
- OK, now you're ready - edit the spreadsheet with your own schedule
You're welcome.
Mike