Skip to content

bond verification

Nicolas Bonnand edited this page Sep 4, 2018 · 9 revisions

8.3 Bond verification

8.3.1 Bond configuration verification

diag

  • a Select bridge br1
  • b You should now see a port "B1" with 2 subinterfaces p12a and p12b (c) attached to it.
  • d Bond params you have chosen during B1 creation should be displayed.

8.3.2 network topology verification

diag

  • a Select plotnetcfg tab.
  • b Enter keywords for plotnetfg elements that you want to hide
  • c Press refresh You can see that B1 from switch br1 and B2 from switch br2 are connected by 2 different paths
  • d first path through veth pair p12a-p21a
  • e second path through veth pair p12b-p21b
Clone this wiki locally