Skip to content

Merge pull request #430 from nspcc-dev/dco-upgrade #1083

Merge pull request #430 from nspcc-dev/dco-upgrade

Merge pull request #430 from nspcc-dev/dco-upgrade #1083

Triggered via push August 30, 2023 09:20
Status Failure
Total duration 56s
Artifacts

go.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (1.19.x)
Process completed with exit code 2.
test (1.17.x)
The job was canceled because "_1_19_x" failed.
test (1.17.x)
The operation was canceled.
test (1.18.x)
The job was canceled because "_1_19_x" failed.
test (1.18.x)
The operation was canceled.