Skip to content

Adding pass through LUTs before handling dangling wires. #1024

Adding pass through LUTs before handling dangling wires.

Adding pass through LUTs before handling dangling wires. #1024

Triggered via pull request September 10, 2024 07:28
Status Cancelled
Total duration 3m 46s
Artifacts

CI.yml

on: pull_request
Matrix: linux-gcc
Fit to window
Zoom out
Zoom in

Annotations

8 errors
centos7-gcc
Canceling since a higher priority waiting request for 'yosys-verific CI-refs/pull/783/merge' exists
centos7-gcc
The operation was canceled.
designEdit
Canceling since a higher priority waiting request for 'yosys-verific CI-refs/pull/783/merge' exists
designEdit
The operation was canceled.
install
Canceling since a higher priority waiting request for 'yosys-verific CI-refs/pull/783/merge' exists
install
The operation was canceled.
test
Canceling since a higher priority waiting request for 'yosys-verific CI-refs/pull/783/merge' exists
test
The operation was canceled.