Adding pass through LUTs before handling dangling wires. #1024
Triggered via pull request
September 10, 2024 07:28
Status
Cancelled
Total duration
3m 46s
Artifacts
–
Annotations
8 errors
centos7-gcc
Canceling since a higher priority waiting request for 'yosys-verific CI-refs/pull/783/merge' exists
|
centos7-gcc
The operation was canceled.
|
designEdit
Canceling since a higher priority waiting request for 'yosys-verific CI-refs/pull/783/merge' exists
|
designEdit
The operation was canceled.
|
install
Canceling since a higher priority waiting request for 'yosys-verific CI-refs/pull/783/merge' exists
|
install
The operation was canceled.
|
test
Canceling since a higher priority waiting request for 'yosys-verific CI-refs/pull/783/merge' exists
|
test
The operation was canceled.
|