Skip to content

update path to correct layout template (#5704) #4883

update path to correct layout template (#5704)

update path to correct layout template (#5704) #4883

Triggered via push December 1, 2024 15:58
Status Failure
Total duration 4m 57s
Artifacts

ci.yml

on: push
Matrix: integration-test-elixir
Matrix: mix_test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
mix test (OTP 27.1 | Elixir 1.17.3): test/phoenix/integration/endpoint_test.exs#L126
test adapters starts on configured port and serves requests and stops for prod (Phoenix.Integration.EndpointTest)
mix test (OTP 27.1 | Elixir 1.17.3)
Process completed with exit code 2.
integration-test-elixir (1.15.8, 24.3.4.17, alpine-3.20.3)
Process completed with exit code 2.
integration-test-elixir (1.17.3, 27.1.2, alpine-3.20.3)
The job was canceled because "_1_15_8_24_3_4_17_alpine-" failed.
integration-test-elixir (1.17.3, 27.1.2, alpine-3.20.3)
The operation was canceled.