cherry-pick-8.1: br: fix insert gc failed due to slow schema reload (#57742) #7523
integration-test-dumpling.yml
on: pull_request
Matrix: integration-test
Annotations
6 errors and 2 warnings
integration-test (8.0.26):
br/pkg/task/stream.go#L1894
undefined: logclient
|
integration-test (8.0.26)
Process completed with exit code 2.
|
integration-test (8.0.22):
br/pkg/task/stream.go#L1894
undefined: logclient
|
integration-test (8.0.22)
Process completed with exit code 2.
|
integration-test (5.7.35)
The job was canceled because "_8_0_26" failed.
|
integration-test (5.7.35)
The operation was canceled.
|
integration-test (8.0.26)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
integration-test (8.0.22)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|