Skip to content

cherry-pick-8.1: br: fix insert gc failed due to slow schema reload (#57742) #7525

cherry-pick-8.1: br: fix insert gc failed due to slow schema reload (#57742)

cherry-pick-8.1: br: fix insert gc failed due to slow schema reload (#57742) #7525

Re-run triggered December 13, 2024 02:59
Status Failure
Total duration 7m 39s
Artifacts
Matrix: integration-test
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
integration-test (8.0.26)
Process completed with exit code 2.
integration-test (5.7.35)
The job was canceled because "_8_0_26" failed.
integration-test (5.7.35)
Process completed with exit code 2.
integration-test (8.0.22)
The job was canceled because "_8_0_26" failed.
integration-test (8.0.22)
The operation was canceled.
integration-test (8.0.26)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636