Skip to content

pre-commit: using ruff format #163

pre-commit: using ruff format

pre-commit: using ruff format #163

Triggered via push November 5, 2023 19:52
Status Failure
Total duration 7m 48s
Artifacts

build.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (3.11)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.