Skip to content

Fixed a detail.

Fixed a detail. #3

Triggered via push September 21, 2023 12:29
Status Failure
Total duration 2m 53s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.9)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
Process completed with exit code 1.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
The operation was canceled.
build (3.11)
The job was canceled because "_3_9" failed.
build (3.11)
The operation was canceled.