Skip to content

build(deps): Bump github.com/rs/zerolog from 1.30.0 to 1.31.0 in /types #1766

build(deps): Bump github.com/rs/zerolog from 1.30.0 to 1.31.0 in /types

build(deps): Bump github.com/rs/zerolog from 1.30.0 to 1.31.0 in /types #1766

Triggered via pull request September 25, 2023 17:24
Status Failure
Total duration 1m 22s
Artifacts

tests.yml

on: pull_request
Matrix: unit
integration
32s
integration
coverage
0s
coverage
Fit to window
Zoom out
Zoom in

Annotations

10 errors
integration
Process completed with exit code 2.
unit (app)
Process completed with exit code 2.
unit (x/intertx)
The job was canceled because "app" failed.
unit (x/intertx)
The operation was canceled.
unit (x/ecocredit)
The job was canceled because "app" failed.
unit (x/ecocredit)
The operation was canceled.
unit (types)
The job was canceled because "app" failed.
unit (types)
The operation was canceled.
unit (x/data)
The job was canceled because "app" failed.
unit (x/data)
The operation was canceled.