build(deps): Bump google.golang.org/grpc from 1.58.2 to 1.58.3 #1782
tests.yml
on: pull_request
Matrix: unit
integration
31s
coverage
0s
Annotations
10 errors
unit (x/data)
Process completed with exit code 2.
|
unit (x/ecocredit)
The job was canceled because "x_data" failed.
|
unit (x/ecocredit)
Process completed with exit code 2.
|
unit (x/intertx)
The job was canceled because "x_data" failed.
|
unit (x/intertx)
The operation was canceled.
|
integration
Process completed with exit code 2.
|
unit (app)
The job was canceled because "x_data" failed.
|
unit (app)
The operation was canceled.
|
unit (types)
The job was canceled because "x_data" failed.
|
unit (types)
The operation was canceled.
|