Skip to content

build(deps): Bump github.com/google/go-cmp from 0.5.9 to 0.6.0 in /x/ecocredit #1783

build(deps): Bump github.com/google/go-cmp from 0.5.9 to 0.6.0 in /x/ecocredit

build(deps): Bump github.com/google/go-cmp from 0.5.9 to 0.6.0 in /x/ecocredit #1783

Triggered via pull request October 11, 2023 11:20
Status Failure
Total duration 58s
Artifacts

tests.yml

on: pull_request
Matrix: unit
integration
36s
integration
coverage
0s
coverage
Fit to window
Zoom out
Zoom in

Annotations

10 errors
unit (app)
Process completed with exit code 2.
integration
Process completed with exit code 2.
unit (types)
The job was canceled because "app" failed.
unit (types)
The operation was canceled.
unit (x/data)
The job was canceled because "app" failed.
unit (x/data)
The operation was canceled.
unit (x/ecocredit)
The job was canceled because "app" failed.
unit (x/ecocredit)
The operation was canceled.
unit (x/intertx)
The job was canceled because "app" failed.
unit (x/intertx)
The operation was canceled.