Skip to content

build(deps): Bump github.com/google/go-cmp from 0.5.9 to 0.6.0 in /x/ecocredit #1790

build(deps): Bump github.com/google/go-cmp from 0.5.9 to 0.6.0 in /x/ecocredit

build(deps): Bump github.com/google/go-cmp from 0.5.9 to 0.6.0 in /x/ecocredit #1790

Triggered via pull request October 12, 2023 15:21
Status Failure
Total duration 1m 26s
Artifacts 1

tests.yml

on: pull_request
Matrix: unit
integration
32s
integration
coverage
0s
coverage
Fit to window
Zoom out
Zoom in

Annotations

8 errors
integration
Process completed with exit code 2.
unit (app)
Process completed with exit code 2.
unit (types)
The job was canceled because "app" failed.
unit (types)
The operation was canceled.
unit (x/data)
The job was canceled because "app" failed.
unit (x/data)
The operation was canceled.
unit (x/ecocredit)
The job was canceled because "app" failed.
unit (x/ecocredit)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
coverage-x-intertx Expired
58.9 KB