Perf improv #2523
rust.yml
on: pull_request
Integration
8m 48s
Matrix: Build
Annotations
5 errors
Build (--locked)
Process completed with exit code 1.
|
Build (--locked --no-default-features)
The job was canceled because "_--locked" failed.
|
Build (--locked --no-default-features)
Process completed with exit code 1.
|
Build (--locked --features metrics_process)
The job was canceled because "_--locked" failed.
|
Build (--locked --features metrics_process)
The operation was canceled.
|