Skip to content

chore(deps): update time requirement from =0.3.23 to =0.3.26 #582

chore(deps): update time requirement from =0.3.23 to =0.3.26

chore(deps): update time requirement from =0.3.23 to =0.3.26 #582

Triggered via pull request August 21, 2023 08:18
Status Failure
Total duration 7m 4s
Artifacts

ci.yml

on: pull_request
Matrix: Check
Matrix: Clippy
Matrix: Compatibility Test Suite
Matrix: Rustfmt
Matrix: Tarpaulin
Matrix: Test Suite (feature-matrix)
Matrix: Test Suite
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Test Suite (1.65.0)
Process completed with exit code 101.
Test Suite (stable)
The job was canceled because "_1_65_0" failed.
Test Suite (feature-matrix) (1.65.0, --all-features)
Process completed with exit code 101.
Test Suite (feature-matrix) (1.65.0, --no-default-features)
The job was canceled because "_1_65_0_--all-features" failed.
Test Suite (feature-matrix) (1.65.0, --no-default-features)
Process completed with exit code 101.
Test Suite (feature-matrix) (stable, --all-features)
The job was canceled because "_1_65_0_--all-features" failed.
Test Suite (feature-matrix) (stable, --all-features)
The operation was canceled.