Priority big int conversion should not causing underflow #4657
integration-test.yml
on: pull_request
Matrix: integration-tests
Integration Test Check
23s
Annotations
23 errors and 2 warnings
Integration Test (SeiDB State Store)
The job running on runner GitHub Actions 432 has exceeded the maximum execution time of 30 minutes.
|
Integration Test (SeiDB State Store)
The operation was canceled.
|
Integration Test (SeiDB State Store)
The job running on runner GitHub Actions 319 has exceeded the maximum execution time of 30 minutes.
|
Integration Test (SeiDB State Store)
The operation was canceled.
|
Integration Test (Distribution Module)
The job running on runner GitHub Actions 405 has exceeded the maximum execution time of 30 minutes.
|
Integration Test (Distribution Module)
The operation was canceled.
|
Integration Test (Mint & Staking & Bank Module)
The job running on runner GitHub Actions 154 has exceeded the maximum execution time of 30 minutes.
|
Integration Test (Mint & Staking & Bank Module)
The operation was canceled.
|
Integration Test (Wasm Module)
The job running on runner GitHub Actions 475 has exceeded the maximum execution time of 30 minutes.
|
Integration Test (Wasm Module)
The operation was canceled.
|
Integration Test (Chain Operation Test)
The job running on runner GitHub Actions 57 has exceeded the maximum execution time of 30 minutes.
|
Integration Test (Chain Operation Test)
The operation was canceled.
|
Integration Test (EVM Module)
The job running on runner GitHub Actions 369 has exceeded the maximum execution time of 30 minutes.
|
Integration Test (EVM Module)
The operation was canceled.
|
Integration Test (Upgrade Module (Minor))
The job running on runner GitHub Actions 337 has exceeded the maximum execution time of 30 minutes.
|
Integration Test (Upgrade Module (Minor))
The operation was canceled.
|
Integration Test (EVM Interoperability)
The job running on runner GitHub Actions 81 has exceeded the maximum execution time of 30 minutes.
|
Integration Test (EVM Interoperability)
The operation was canceled.
|
Integration Test (Gov & Oracle & Authz Module)
The job running on runner GitHub Actions 193 has exceeded the maximum execution time of 30 minutes.
|
Integration Test (Gov & Oracle & Authz Module)
The operation was canceled.
|
Integration Test (Upgrade Module (Major))
The job running on runner GitHub Actions 469 has exceeded the maximum execution time of 30 minutes.
|
Integration Test (Upgrade Module (Major))
The operation was canceled.
|
Integration Test Check
Final attempt failed. Child_process exited with error code 1
|
Integration Test Check
The following actions uses Node.js version which is deprecated and will be forced to run on node20: nick-fields/retry@v2. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
Integration Test Check
Attempt 1 failed. Reason: Child_process exited with error code 1
|