Skip to content

Priority big int conversion should not causing underflow #4657

Priority big int conversion should not causing underflow

Priority big int conversion should not causing underflow #4657

Re-run triggered August 2, 2024 16:43
Status Failure
Total duration 30m 56s
Artifacts

integration-test.yml

on: pull_request
Matrix: integration-tests
Integration Test Check
23s
Integration Test Check
Fit to window
Zoom out
Zoom in

Annotations

23 errors and 2 warnings
Integration Test (SeiDB State Store)
The job running on runner GitHub Actions 432 has exceeded the maximum execution time of 30 minutes.
Integration Test (SeiDB State Store)
The operation was canceled.
Integration Test (SeiDB State Store)
The job running on runner GitHub Actions 319 has exceeded the maximum execution time of 30 minutes.
Integration Test (SeiDB State Store)
The operation was canceled.
Integration Test (Distribution Module)
The job running on runner GitHub Actions 405 has exceeded the maximum execution time of 30 minutes.
Integration Test (Distribution Module)
The operation was canceled.
Integration Test (Mint & Staking & Bank Module)
The job running on runner GitHub Actions 154 has exceeded the maximum execution time of 30 minutes.
Integration Test (Mint & Staking & Bank Module)
The operation was canceled.
Integration Test (Wasm Module)
The job running on runner GitHub Actions 475 has exceeded the maximum execution time of 30 minutes.
Integration Test (Wasm Module)
The operation was canceled.
Integration Test (Chain Operation Test)
The job running on runner GitHub Actions 57 has exceeded the maximum execution time of 30 minutes.
Integration Test (Chain Operation Test)
The operation was canceled.
Integration Test (EVM Module)
The job running on runner GitHub Actions 369 has exceeded the maximum execution time of 30 minutes.
Integration Test (EVM Module)
The operation was canceled.
Integration Test (Upgrade Module (Minor))
The job running on runner GitHub Actions 337 has exceeded the maximum execution time of 30 minutes.
Integration Test (Upgrade Module (Minor))
The operation was canceled.
Integration Test (EVM Interoperability)
The job running on runner GitHub Actions 81 has exceeded the maximum execution time of 30 minutes.
Integration Test (EVM Interoperability)
The operation was canceled.
Integration Test (Gov & Oracle & Authz Module)
The job running on runner GitHub Actions 193 has exceeded the maximum execution time of 30 minutes.
Integration Test (Gov & Oracle & Authz Module)
The operation was canceled.
Integration Test (Upgrade Module (Major))
The job running on runner GitHub Actions 469 has exceeded the maximum execution time of 30 minutes.
Integration Test (Upgrade Module (Major))
The operation was canceled.
Integration Test Check
Final attempt failed. Child_process exited with error code 1
Integration Test Check
The following actions uses Node.js version which is deprecated and will be forced to run on node20: nick-fields/retry@v2. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
Integration Test Check
Attempt 1 failed. Reason: Child_process exited with error code 1