Skip to content

Re-order the targets in Package.swift #1224

Re-order the targets in Package.swift

Re-order the targets in Package.swift #1224

Triggered via push December 26, 2024 14:48
Status Failure
Total duration 2m 22s
Artifacts

test.yml

on: push
Matrix: Build for embedded target
Matrix: Build for native target
Matrix: Build and Test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Build and Test (ubuntu-22.04, wasm-5.9.1-RELEASE, Node)
Process completed with exit code 2.
Build and Test (ubuntu-22.04, https://download.swift.org/swift-6.0.2-release/ubuntu2204/swift-6.0...
The job was canceled because "ubuntu-22_04_wasm-5_9_1-R" failed.
Build and Test (ubuntu-20.04, wasm-5.9.1-RELEASE, MicroWASI)
The job was canceled because "ubuntu-22_04_wasm-5_9_1-R" failed.
Build and Test (ubuntu-20.04, wasm-5.9.1-RELEASE, MicroWASI)
The operation was canceled.
Build and Test (ubuntu-22.04, https://download.swift.org/development/ubuntu2204/swift-DEVELOPMENT...
The job was canceled because "ubuntu-22_04_wasm-5_9_1-R" failed.
Build and Test (ubuntu-22.04, https://download.swift.org/development/ubuntu2204/swift-DEVELOPMENT...
The job was canceled because "ubuntu-22_04_wasm-5_9_1-R" failed.
Build and Test (macos-14, wasm-5.9.1-RELEASE, Node, Xcode_15.2.app)
The job was canceled because "ubuntu-22_04_wasm-5_9_1-R" failed.
Build and Test (macos-14, wasm-5.9.1-RELEASE, Node, Xcode_15.2.app)
The operation was canceled.