Update MariaDB Connector to Version 3.3.8 #18
Triggered via pull request
December 28, 2023 07:42
Status
Failure
Total duration
8h 10m 54s
Artifacts
1
CI-taptests-groups.yml
on: pull_request
Annotations
3 errors and 1 warning
run / tests (tests)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 360 minutes.
|
run / tests (tests)
Process completed with exit code 1.
|
run / tests (tests)
The operation was canceled.
|
run / tests (tests)
There are over 10,000 files in this artifact, consider creating an archive before upload to improve the upload performance.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
CI-taptests-groups-07def3c51b889f193d33aed5daadf2dc23ccf21c-run#18-tests
Expired
|
17.1 GB |
|