Multi stage docker build #363
on-pr.yml
on: pull_request
Matrix: build-and-test / build-ttmlir
pre-commit
/
pre-commit
32s
spdx
/
check-spdx-headers
3s
Matrix: docker-build / build-and-test
Matrix: macos-build / build
Matrix: build-and-test / run-tests
Annotations
4 errors and 1 warning
pre-commit / pre-commit
Process completed with exit code 1.
|
docker-build / build-and-test (ubuntu-22-04, builder, Release, ON)
Process completed with exit code 1.
|
build-and-test / build-ttmlir (builder, OFF, run)
The job running on runner builder-2 has exceeded the maximum execution time of 30 minutes.
|
build-and-test / build-ttmlir (builder, OFF, run)
The operation was canceled.
|
pre-commit / pre-commit
The `python-version` input is not set. The version of Python currently in `PATH` will be used.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
build-artifacts-perf
|
3.3 GB |
|
test-reports-builder
|
1.03 KB |
|
test-reports-macos-latest
|
1.03 KB |
|
ttrt-whl-perf
|
188 MB |
|
ttrt-whl-run
|
181 MB |
|