Skip to content

Port over charm lib changes from k8s charm relating to pod reschdule during cluster setup #2989

Port over charm lib changes from k8s charm relating to pod reschdule during cluster setup

Port over charm lib changes from k8s charm relating to pod reschdule during cluster setup #2989

Triggered via pull request September 10, 2024 12:10
Status Cancelled
Total duration 2m 53s
Billable time 3m
Artifacts

ci.yaml

on: pull_request
Build charm  /  Collect bases for charm | .
18s
Build charm / Collect bases for charm | .
Lint  /  Lint .github/workflows/
4s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
15s
Lint / tox run -e lint
Unit test charm
22s
Unit test charm
Check libraries
35s
Check libraries
Matrix: Build charm / build
Matrix: integration-test
Waiting for pending jobs
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
Check libraries
Charmcraft libraries are not up to date.
Build charm / Build charm | base #1
Canceling since a higher priority waiting request for 'Tests-refs/pull/518/merge' exists
Build charm / Build charm | base #1
The operation was canceled.
Build charm / Build charm | base #0
Canceling since a higher priority waiting request for 'Tests-refs/pull/518/merge' exists
Build charm / Build charm | base #0
The operation was canceled.
Unit test charm
Codecov: Failed to properly create commit: The process '/home/runner/work/_actions/codecov/codecov-action/v4/dist/codecov' failed with exit code 1
Tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.