Skip to content

chore: setup integration tests #7

chore: setup integration tests

chore: setup integration tests #7

Triggered via pull request September 13, 2024 15:48
Status Cancelled
Total duration 2m 18s
Artifacts

ci.yml

on: pull_request
Check formatting
22s
Check formatting
Static code analysis
35s
Static code analysis
Integration Tests on Web
1m 6s
Integration Tests on Web
Package score
45s
Package score
Matrix: Build Android APK
Matrix: Build web
Matrix: Integration Tests on Android
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Integration Tests on Android (34)
Canceling since a higher priority waiting request for 'CI-10' exists
Integration Tests on Android (34)
The operation was canceled.
Integration Tests on Android (23)
Canceling since a higher priority waiting request for 'CI-10' exists
Integration Tests on Android (23)
The operation was canceled.
Build Android APK
Canceling since a higher priority waiting request for 'CI-10' exists
Build Android APK
The operation was canceled.
Build Android APK (3.22.3)
Canceling since a higher priority waiting request for 'CI-10' exists
Build Android APK (3.22.3)
The operation was canceled.