Upgrade bitcoin
dependency to 0.31.0
#2705
rust.yml
on: pull_request
Integration
4m 7s
Matrix: Build
Annotations
6 errors
Integration
Process completed with exit code 1.
|
Build (--locked)
Process completed with exit code 101.
|
Build (--locked --features metrics_process)
The job was canceled because "_--locked" failed.
|
Build (--locked --features metrics_process)
The operation was canceled.
|
Build (--locked --no-default-features)
The job was canceled because "_--locked" failed.
|
Build (--locked --no-default-features)
The operation was canceled.
|